Modernization of traffic radar complex Cherni Vrah | 2015 | BULATSA

MODERNIZATION OF TRAFFIC RADAR COMPLEX CHERNI VRAH
IMG_20160415_191927

CLIENT: “Bulgarian Air Traffic Services Authority” (BULATSA)
TERM: 2015
LOCATION: Bulgaria, Cherni Vrah
STATUS: Completed


Project goals:

  • Modernization of radar complexes for BULATSA: Site: Traffic radar complex Cherni vrah;
  • Rehabilitation of radar complex. Official contractor Thales Air Systems S.A.S, official subcontractor: Balkantel Ltd;
  • The scope of the contract includes design, factory tests (FAT), site functional tests (SAT) and deliveries, construction works, adjustments, trial operation and entry into normal operation;

Activities:

  • Dismantling of an existing steel structure, radome, primary and secondary antenna, waveguides, equipment, etc.;
  • Installation of adapting ring for fixing a new antenna;
  • Mounting a new primary and secondary antennaswith a diameter of 17m ;
  • Mounting a new radome;
  • Installation of new electric switchboard and electrical network in radome;
  • Making a new access door to the equipment room and mechanical installation;
Read more

Establishment of new airport radar complex Sofia | 2016 – 2017 | BULATSA

ESTABLISHMENT OF NEW AIRPORT RADAR COMPLEX SOFIA

CLIENT: “Bulgarian Air Traffic Services Authority” (BULATSA)
TERM: 2016 – 2017
LOCATION: Bulgaria, Sofia airport
STATUS: Completed


Project goals:

  • Modernization of radar complexes for BULATSA: Site: Sofia airport radar complex;
  • Establishment of a new radar complex. Official contractor Thales Air Systems S.A.S, official subcontractor: Balkantel Ltd;
  • The scope of the contract includes design, factory tests (FAT), site functional tests (SAT) and deliveries, construction works, adjustments, trial operation and entry into normal operation;

Activities:

  • Installation of remote sensing system NMS “Umbrella” and signal cables. The system is fully developed by Balkantel;
  • Installation of an iron-grid tower, calculated by Eurocode, including steel-concrete foundation, platform, radome radial ring, ladder and electric winch;
  • Installation of pedestal, primary and secondary antennas;
  • Radome mounting in conjunction with adjoining electrical and lighting installations and warning lights;
  • Installing the antenna motor container;
  • Installation of tower lightning protection and earthing;
  • Radar container assembly consisting of two 24 “ISO containers, including steel-concrete foundation and supports;
  • Diesel generator container installation – 20 “ISO container, including steel-concrete foundation and supports;
  • Power supply installation including electrical cables and 4 pcs. electrical switchboards: 1 pc. in a container for diesel generator, 2 pcs. in a radar container and 1 pc. in an antenna motor container;
  • Grounding installation of radar equipment and container for diesel generator;
  • Installation of a diesel generator with automatic control;
  • Installation of a reserved power supply system with two UPS units;
  • Installation of air conditioning system, including 4 pcs. air conditioner for the container with radar equipment;
  • Installation of a ventilation system from louvre grids in a container for a diesel generator;
  • Lighting installation in containers and tower;
  • Installation of a fire extinguishing system;
  • Installation of an access control system;
  • Site works – road pavement and crushed stone embankment;
Read more

Modernization of Traffic Radar Complex Varbitsa | 2016 | BULATSA

MODERNIZATION OF TRAFFIC RADAR COMPLEX VARBITSA

CLIENT: “Bulgarian Air Traffic Services Authority” (BULATSA)
TERM: 2016
LOCATION: Bulgaria, Varbitsa
STATUS: Completed


Project goals:

  • Modernization of radar complexes for BULATSA: Site: Traffic radar complex Varbitsa;
  • Rehabilitation of radar complex. Official contractor Thales Air Systems S.A.S, official subcontractor: Balkantel Ltd;
  • The scope of the contract includes design, factory tests (FAT), site functional tests (SAT) and deliveries, construction works, adjustments, trial operation and entry into normal operation;

Activities:

  • Dismantling of an existing steel structure, radome, primary antenna, pedestal, racks, waveguides, etc.;
  • Installation of adapting ring for fixing a new antenna;
  • Installation of a new pedestal;
  • Mounting a new primary and secondary antennas;
  • Mounting a new radome with a diameter of 17m;
  • Installation of new electric panel and electrical network in radome;
  • Dismantling of an existing secondary radome, secondary antenna, pedestal and steel tower;
  • Installation of a new steel structure;
Read more

Modernization of VOR / DME navigation systems for BULATSA | 2015 – 2017| BULATSA

MODERNIZATION, CONSTRUCTION AND INSTALLATION ACTIVITIES FOR VOR / DME NAVIGATION SYSTEMS – “BULGARIAN AIR TRAFFIC SERVICES AUTHORITY”

 

 

 

 

 

 

 


CLIENT: “Bulgarian Air Traffic Services Authority” (BULATSA)
TERM: 2015 – present
LOCATION: Bulgaria
STATUS: In progress


Project goals:

  • Delivery of 5 pieces VOR/DME + 1 DME;
  • Factory tests;
  • Site tests;
  • Installation and commissioning;
  • Constructional activities.

BALKANTEL activities as a subcontractor of THALES AIR SYSTEMS S.A.S.:

  • Establishment of two new sites including shelters and counterbalances – Burgas airport and Gorna Oryahovitsa airport;
  • Repair of existing equipment (shelters and counterbalances) – Sofia airport, Varna airport, Baylovo, Golyama Brestnitsa (including DME, colocated with CVOR);
  • Installation and commissioning;
  • Additional activities – construction of foundations, repairs, construction and assembly activities, relocation and extension of cables, lightning protection, earthing, dismantling of old existing equipment, etc.
Read more

Instrument landing system, communication and meteorological systems for Plovdiv airport | 2004 – 2005 | BULATSA

INSTRUMENT LANDING SYSTEM, COMMUNICATION AND METEOROLOGICAL SYSTEMS FOR PLOVDIV AIRPORT


CLIENT: “Bulgarian Air Traffic Services Authority” (BULATSA)
TERM: 2004 – 2005
LOCATION: Bulgaria, Plovdiv airport
STATUS: Completed


Project goals:

Preparation and implementation of a project for building a instrumentation landing system (ILS), meteorological systems and communication systems at Plovdiv airport;

Activities:

  • A detailed engineering report, including topography, construction, power and cabling;
  • Installation of foundations, shelters and special auxiliary structures;
  • Installation of power cables and telecommunication cables;
  • Installation of equipment;
Read more