CLIENT: National Railway Infrastructure Company (NRIC)
TERM: 2014 – 2015
LOCATION: Bulgaria, Pirdop – Karlovo
STATUS: Completed
The project scope includes 8 operation points (stations) and 10 level crossings, with a kilometer location of the reception facilities as follows:
(1)station Pirdop – km 83 + 859 (2)
(2)station Anton – km 90 + 932
(3)station Koprivshtitsa – km 100 + 240
(4)station Stryama – km 106 + 980
(5)station Klisura – km116 + 117
(6) station Hristo Danovo –km 130 + 430
(7)station Sopot – km 144 + 268
(8)гара Карлово – км 149 + 534.
The activities to be carried out include the reorganization of existing stationary station centralizations at Pirdop, Anton, Koprivshtitsa, Stryama, Klisura, Hristo Danovo and Sopot railway stations:
- Complete replacement of existing cable network in the station;
- Control of the availability between stations with axle counters type 6316LS (decentralized);
- Replacement of the existing in the stations control panel boards ;
- Supply and installation of new distribution frame for the cables in the relay rooms;
- Supply and installation of new power cabinets and cupboards with batteries;